The work of the Ukrainian-German project on municipal energy management in Vyshgorod, Kyiv region, was continued after the re-establishment of financing chains and provision of quality materials.
Currently it is fully completed:
- Replacement of windows.
- Roof insulation.
The following stages of work have been started:
- Insulation of facades.
- Installation of an individual heating point.
- Installation of air recuperators.
- Installation of ventilation and fire protection system.
The project of thermal modernization became the basis of the master’s work of the applicant in the specialty “141 Electric Power Engineering, Electrical Engineering and Electromechanics” Voitenko Serhii.
Calculations and forecasts made by UIPA students Voitenko Serhii and Obemok Zlata will become the basis for methodological materials on effective thermal modernization of buildings in the climate of Ukraine.